Electrification & Plant
It's your line. You'll keep power flowing through it and keep
thousands of trains moving. And you'll do it every day.
40% of our network is electrified and over 60% of all rail
traffic is electric. So you can imagine the size and importance of
our work. We not only maintain the power for these overhead lines
and the electrified rail, we also have to make sure everything is
done safely and efficiently. In addition, we take responsibility
for all our fixed plant, including the generators, pumps and
electrical supply systems.
Electrification & Plant (E&P) can be divided into three
areas: Contact Systems – which allows the train to pick up
electrical current; Distribution – where we make sure that the
power gets from the National Grid to the train; and Plant – which
is all the fixed machinery that is used trackside to keep the
railway running. In fact, there is a wide range of work, and you'll
get a good general insight into much of what we do. Also E&P is
a massive part of our infrastructure – overall we use 1% of the
electricity generated in the UK.